Most contractors make you call just to hear a ballpark. CTS Services publishes its real ranges, so you can budget before you ever pick up the phone.
Hydro excavation in Arkansas typically runs $250 to $300 per hour for a hydrovac truck and operator, and most full jobs land in a $3,000 to $3,500 day rate covering the truck, driver, fuel surcharge, consumables, and onsite disposal. These are CTS Services' typical ranges, and your project may vary with soil, depth, and access.
Here is the full rate structure at a glance:
Every figure above is a range on purpose. Site conditions change dig speed, so each job is quoted against these ranges, never as one flat number.
The model is simple: hourly billing with a day-rate minimum on most projects, and mobilization quoted per job. Potholing, daylighting, and slot trenching all bill hourly because soil conditions drive the time, not the task name.
The $250 to $300 hourly rate covers the truck and its operator. Most projects are quoted against the $3,000 to $3,500 day rate, since that is how most real utility work runs. No job is too small, but small jobs still carry a minimum, typically the day rate.
One price covers the people, the machine, and the basics, with no surprise line items:
If spoils can stay onsite, the hourly or day rate is the whole bill for the dig itself.
Two items commonly sit outside the base rate. Offsite debris removal runs about $150 per load, and additional ADS hose beyond the standard setup is billed separately. Both are spelled out in the quote before work starts.
Two jobs with identical scopes can land at different points in the range. Four variables explain most of the spread.
Soil is the number one factor. Hard clay and rocky ground dig slower than sandy soil, which means more hours at the same rate. Central Arkansas has plenty of both, so an honest look at your soil is the first thing CTS asks about.
If vacuumed material can be deposited onsite, you pay only the hourly or day rate. Offsite hauling adds about $150 per load plus drive time to the disposal point, so a nearby deposit spot saves real money.
CTS dispatches from Benton, and mobilization is quoted per job. Longer hauls and multi-day projects that require overnight stays push a quote toward the top of its range. Traffic control, where required, is usually managed by the client.
Scheduled weekday work books at standard rates. After-hours work bills at 1.5x hourly, and emergency or holiday call-outs run up to double time. The flip side works in your favor when something breaks: the phone is answered 24/7, and mobilization can begin within 1 to 2 hours depending on conditions.
An hourly rate only tells half the story; the other half is how many hours a crew burns. CTS has run industrial vacuum truck work for 13+ years, and that experience means we know how to set up jobs, not figure them out on your dime. Setup, dig sequence, and spoils handling are decided before the water ever hits the ground.
There is no clock game here either. CTS does not stretch work into extra days to pad an invoice, and when you call, you reach a true decision-maker rather than a regional dispatch queue. An EMR of 0.73 keeps jobs moving without incident-related delays. For the rig's full scope, see our hydro excavation service page; our separate hydro excavation cost guide covers industry-wide averages rather than CTS's own rates.
A real quote takes one short conversation. To price your job accurately, CTS needs a handful of details:
Commercial accounts run on Net 30 terms; new and out-of-state customers keep a card on file.
CTS Services bills hydro excavation at $250 to $300 per hour for the truck and operator, quoted as a range because conditions vary. That rate covers a supervisor and technician crew plus the rig. Most full jobs land closer to the day rate. Call for a site-specific number.
A typical CTS day rate of $3,000 to $3,500 covers the truck, driver, fuel surcharge, basic consumables, and onsite spoils deposit. PPE and marking tape are included. Offsite disposal, at roughly $150 per load, and additional ADS hose are the main extras. Your project may vary.
Soil type is the number one cost factor because hard clay and rock dig slower than sandy soil, adding hours at the same rate. A pothole that takes an hour in loose soil can take two or three in packed clay. Describe your soil when you call for a quote.
After-hours work bills at 1.5 times the normal hourly rate, and emergency or holiday call-outs run up to double time. The line is answered 24/7 and routed to an on-call manager, with mobilization often starting within 1 to 2 hours depending on conditions.
No job is too small, but a minimum applies, typically the day rate of $3,000 to $3,500. Mobilization is quoted per job based on distance from Benton. Short potholing or daylighting tasks are billed hourly, so ask about pairing small tasks to make the day count.
Ready for a site-specific quote? Call or text the CTS team any time, day or night, or send your project details through our contact page. CTS Services, Inc. is based at 1218 River St., Benton, AR 72015.